Lorette Collegiate
Location: Lorette, Manitoba
The 55,000 square foot High School, was built for Seine River School Division to house English and French Immersion students. Construction of the facility included 16 classrooms, a gymnasium, music room, library, computer lab, sciences labs and life skills room. The school was built on a structural slab. Both the interior and exterior walls were entirely masonry construction. The exterior walls featured Manitoba limestone.
Delivery Method: General Contractor
Contract Value: $5,361,617
Year Completed: 1998
Consultant: MCM Architects Inc.
